CSDi
HOME DESIGN PORTFOLIO SLIGHTLY TWISTED PHOTOGRAPHY THE CINEMA ROOM INFORMATION
AMSTERDAM STOCK EXCHANGE
by H.P. Berlage
[PRECEDENT STUDY]
This group light study project tested teamwork and leadership skills. Students were given two weeks to research and document the assigned builing and construct a large scale model to show how the design addressed the issue of light.

I was chosen as the leader of my team and thrown into the fire of scheduling and supervising my teammates to make sure the model was finished on time.

In building the main hall of the building, we decided to start from the inside and build out. The interior arched walls with pilasters were constructed first, followed by the trusses that would support the roof and tie the two sides together. From there, the rest of the wall system was erected, culminating in the roof and skylight structure.

As a final part of the exercise, students were also required to construct an interior perspective and render the drawing in graphite.

| 1 | 2 | 3 |
Get Microsoft Internet Explorer Get Mozilla Firefox Browser Copyright 2005-2006 Corkscrewed Designs